Welcome, Guest



Latest 20 Shouts


Current Weather


SIX Stock

 
 

Recent Posts

Pages: 1 ... 3 4 [5] 6 7 ... 10
41
Great Adventure Chit Chat / Re: 4 Year plan that makes sense
« Last post by WadeJ on June 15, 2017, 09:02:37 AM »
Great topic.  That said, I could see a few rides coming and going in the next 4 years but not because of movie tie-ins or upgrades but rather reaching their useful life span (see Scream Machine).  There does come a point where some of these rides will need massive overhauls and they will need to weigh if it makes more sense to replace or rebuild.  I particular, I sincerely worry about the Log Flume and the Sky Ride but that's just me.  I've heard nothing about them going anywhere.

Nitro is an interesting situation due to it's location to what will ultimately become a full-blown justice league HQ.  Perhaps it's location combined with the fact that it's in dire need of a refresh, could result in a movie tie-in.

And for number 3, either way, regardless of what type of ride, I do believe we are in for a major coaster of some sort in the next 4 years.  I hope!
42
While I'm sure you'll have a great trip, keep in mind these pics are from 2012 :).
43
Thanks for the update and congrats on getting this open!

Great pics Wade. Me and the family will be visiting Clementon Park soon.
44
Great Adventure Chit Chat / Re: 4 Year plan that makes sense
« Last post by Blackhand1001 on May 30, 2017, 06:09:15 PM »
Personally I'd not really sure i'd be happy with replacing Batman with the forceless Garbage B&M makes today. Now if we could get something like Montu in its place i'd be totally game for it.
45
Great Adventure Chit Chat / Re: 4 Year plan that makes sense
« Last post by rjholla2003 on May 24, 2017, 01:08:16 AM »
I don't see 1 or 2 happening. 3...who knows. I have no real comment on that. 4 would be very nice to have happen, because that continues to be a weak point of the park's ride lineup. It's being addressed now more seriously than before, but we have to hope that if they go with a massive package again that they have the staffing to support it. I'd rather have a smart plan implemented than a large package just dropped on the park.
46
Great Adventure Chit Chat / 4 Year plan that makes sense
« Last post by VirtualJoker on May 01, 2017, 11:30:18 AM »
As we know great adventure is notorious for releasing rides with movies. Below is a list of rides released to movies:
    RIDE NAME AND YEAR - MOVIE NAME
1. Batman & Robin the Chiller 1997 [Defunct] - Batman & Robin
2. Batman: The Ride 1992 - Batman Returns
3. The Joker 2016 - Suicide Squad
4. Harley Quin Crazy Train 2016 [Re-theme] - Suicide Squad
5. Green Lantern 2011 - Green Lantern
6. Dark Knight Coaster 2009 - The Dark Knight
7. Justice League: Battle For Metropolis 2017 - Justice League

There is screaming proof that they will do something for next year and the years following after it. Here is my prediction:
1. Nitro Re theme to Aquaman 2018 - Aquaman
2. Batman the ride is taken down in 2019 after celebrating 25 years (2018) and a new B&M custom invert will be built in that plot of land while making use of the land behind and next to movie town stadium. The ride will be called Shazam 2019 - Shazam
3. Cyborg should be a RMC T-Rex coaster Launched coaster (Park technically only has 1 - Kingda Ka) 2020 - Cyborg
4. 2021 and 2020 could be switched and war on lines 2.0 will be in 2020 with the park getting the flat ride package. Wonder Woman Lasso of Truth [Enterprise V2], Riddlers Revenge [Zamperla Giant Discovery], Catwomans whip [Music Express but in a building for a dark ride setting]

These are my predictions for Major things being added to the park. If one happens, not all will happen the years following. Hopefully all this gets added but i doubt that im right at all.
47
Construction Updates / Re: The Joker First Test Run
« Last post by WadeJ on May 02, 2016, 08:51:38 PM »
I dread the wait times but this looks like it will be a lot of fun!
48
Construction Updates / The Joker First Test Run
« Last post by rjholla2003 on April 27, 2016, 10:30:41 PM »
It's testing! It's really testing!  O0

https://www.youtube.com/watch?v=7T6gINZRP1o
49
Six Flags News / Re: Ride Coasters in VR!
« Last post by Ogolo on April 05, 2016, 07:07:22 PM »
A warning straight from Screamscape.
I thought this coaster had crappy load times to begin with add some VR gear and it gets worse:

Quote
Just a word of warning for anyone wanting to try to The New Revolution VR Coaster experience at Six Flags over Georgia. According to a reader who visited the other day, the addition to the VR gear has dramatically increased the length of time it takes to load and dispatch the trains. Our reader reports that they got in line where the 60 minute wait marker was, but the true wait time was nearly three times as long… as it took them 2 hours and 55 minutes to get to the front with three trains in operation.
50
Six Flags News / Re: Ride Coasters in VR!
« Last post by Blackhand1001 on April 04, 2016, 06:12:02 PM »
Kind of glad they didn't do it at our park. They will definitely slow down the queue line of any ride that has them regardless if you plan on using them.
Pages: 1 ... 3 4 [5] 6 7 ... 10