You tell him, Tom! I drove all the way from Iowa to ride Hell Cat (and live in PA)!
I did get that phone call back from the GM David Dorman.
I asked him about the status of the coaster and he said its ready just waiting on the state to see if they need anything else if not it will open maybe Thursday or Friday.
I also mentioned I was with ACE and a long time local and many of us are waiting to ride the coaster.
I asked him what was done to the ride and he said
Brakes (trims) to slow it a bit and make it a more comfortable ride.only on the drop as noted in the photos.
some track work
He said he rode the coaster before the work was done and after and he said its much smoother even in the back seat.
He said it may be a little slower about 1 or 2 seconds but yes it was not good for the track the way it was.
But he said ITS STILL FAST just smoother
.
I also asked about the Jack Rabbit location and he said no plans yet or at least nothing he could tell me. I told him to put in another coaster
and as we all know he did work at many other Six Flags locations